Project Case Study: Air space obstacles
Reva Garmise

Design visualization tools change the face of airport engineering.

Project
Analyze air space obstacles for airport approach and takeoff

Aviation consultant
Hugo Marom

Product application
Computer visualizations using RDV demonstrated that construction projects would not interfere with airport operations.
Every airport engineer knows that airport design does not begin and end with the design and construction of the airport itself. Adjacent residential or commercial structures, roads, bridges, and even temporary equipment such as cranes and gantries must all be considered to ensure obstacle-free airspace for approaches and takeoffs.
Read the entire article

 